UTE WATER PROJECTS
OXBOW ROAD WATERLINE REPLACEMENT
The project consists of removal and installation of approximately 1,100 feet of 6-inch Asbestos Cement (AC) and C900 PVC pipe, respectively, between F 3/10 Rd and F 1/2 Rd; including installation of fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.
PRE-BID MEETING
Mandatory
May 16, 2024
Intersection of Oxbow Rd and F 3/10 Road
BID DATE
May 23, 2024
Ute Water - 2190 H ¼ Road
10 ROAD WATERLINE REPLACEMENT
The project consists of installation of approximately 6,400 feet of 8-inch C900 PVC pipe, including installationof fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.
BID DATE
April 4, 2024
Ute Water - 2190 H ¼ Road
F 1/2 ROAD PARKWAY - PHASE 1
The project consists of installation of approximately 1,700 feet of 8-inch C900 PVC pipe, approximately 400 feet of 12-inch C900 PVC pipe and approximately 150 feet of 10-inch C900 PVC pipe, including installation of fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.
BID DATE
July 20, 2023
Ute Water - 2190 H ¼ Road
12 ROAD WATERLINE IMPROVEMENT
The project consists of installation of approximately 2,250 feet of 8-inch C900 PVC pipe, of which approximately 150 feet is horizontal directional drill (HDD) and pull back (trenchless installation), including installation of fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.
BID DATE
January 27, 2023
Ute Water - 2190 H ¼ Road
COLORADO RIVER PRE-SEDIMENTATION FACILITIES PROJECT (REBID)
The project consists of the construction of two earthen pre-sedimentation ponds with concrete lining, 24-inch piping, concrete outlet structures, associated process and electrical equipment including connection to existing 24-inch discharge pipeline and other miscellaneous work as described in the
Contract Documents.
BID DATE
October 21, 2022
Ute Water - 2190 H ¼ Road
23 ROAD WATERLINE REPLACEMENT
The project consists of installation of approximately 5,500 feet of 8-inch C900 PVC pipe, including installation of fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.
BID DATE
September 1, 2022
Ute Water - 2190 H ¼ Road
NORTH AVENUE WATERLINE REPLACEMENT
The project consists of installation of approximately 3,100 feet of 12-inch C900 PVC pipe and 1,200 feet of 8-inch C900 PVC pipe, including installation of fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.
PRE-BID MEETING
Mandatory
September 16, 2021
Ute Water - 2190 H ¼ Road
BID DATE
September 30, 2021
Ute Water - 2190 H ¼ Road