Please ensure Javascript is enabled for purposes of website accessibility
top of page
Anchor 1

UTE WATER PROJECTS

Priske, Dave
Dave Priske

District Engineer

Lyon, Jeremy
Jeremy Lyon

Project Engineer

Eklund, John
John Eklund

Project Engineer

OXBOW ROAD WATERLINE REPLACEMENT

The project consists of removal and installation of approximately 1,100 feet of 6-inch Asbestos Cement (AC) and C900 PVC pipe, respectively, between F 3/10 Rd and F 1/2 Rd; including installation of fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.

PRE-BID MEETING 

Mandatory 

May 16, 2024

Intersection of Oxbow Rd and F 3/10 Road 

BID DATE

May 23, 2024

Ute Water - 2190 H ¼ Road

10 ROAD WATERLINE REPLACEMENT

The project consists of installation of approximately 6,400 feet of 8-inch C900 PVC pipe, including installationof fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.

PRE-BID MEETING 

Mandatory 

March 28, 2024 

Intersection of 10 Road and Q 3/4 Road 

BID DATE

April 4, 2024

Ute Water - 2190 H ¼ Road

F 1/2 ROAD PARKWAY - PHASE 1

The project consists of installation of approximately 1,700 feet of 8-inch C900 PVC pipe, approximately 400 feet of 12-inch C900 PVC pipe and approximately 150 feet of 10-inch C900 PVC pipe, including installation of fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.

PRE-BID MEETING 

Mandatory 

July 13, 2023

Intersection of Market Street and F 1/2 Road

BID DATE

July 20, 2023

Ute Water - 2190 H ¼ Road

bottom of page