10 ROAD WATERLINE REPLACEMENT

The project consists of installation of approximately 6,400 feet of 8-inch C900 PVC pipe, including installationof fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.

PRE-BID MEETING 

Mandatory 

March 28, 2024 

Intersection of 10 Road and Q 3/4 Road 

BID DATE

April 4, 2024

Ute Water - 2190 H ¼ Road

F 1/2 ROAD PARKWAY - PHASE 1

The project consists of installation of approximately 1,700 feet of 8-inch C900 PVC pipe, approximately 400 feet of 12-inch C900 PVC pipe and approximately 150 feet of 10-inch C900 PVC pipe, including installation of fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.

PRE-BID MEETING 

Mandatory 

July 13, 2023

Intersection of Market Street and F 1/2 Road

BID DATE

July 20, 2023

Ute Water - 2190 H ¼ Road

12 ROAD WATERLINE IMPROVEMENT

The project consists of installation of approximately 2,250 feet of 8-inch C900 PVC pipe, of which approximately 150 feet is horizontal directional drill (HDD) and pull back (trenchless installation), including installation of fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.

PRE-BID MEETING 

January 23, 2023

Intersection of 12 Road and M ¼ Road

BID DATE

January 27, 2023

Ute Water - 2190 H ¼ Road

COLORADO RIVER PRE-SEDIMENTATION FACILITIES PROJECT (REBID)

The project consists of the construction of two earthen pre-sedimentation ponds with concrete lining, 24-inch piping, concrete outlet structures, associated process and electrical equipment including connection to existing 24-inch discharge pipeline and other miscellaneous work as described in the
Contract Documents.

BID DATE

October 21, 2022

Ute Water - 2190 H ¼ Road

23 ROAD WATERLINE REPLACEMENT

The project consists of installation of approximately 5,500 feet of 8-inch C900 PVC pipe, including installation of fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.

PRE-BID MEETING 

August 29, 2022

Northeast shoulder of the intersection at 23 Road and H Road

BID DATE

September 1, 2022

Ute Water - 2190 H ¼ Road

NORTH AVENUE WATERLINE REPLACEMENT

The project consists of installation of approximately 3,100 feet of 12-inch C900 PVC pipe and 1,200 feet of 8-inch C900 PVC pipe, including installation of fire hydrants, connection to existing mains and services, and other miscellaneous work as described in the Contract Documents.

PRE-BID MEETING 

Mandatory 

September 16, 2021

Ute Water - 2190 H ¼ Road

BID DATE

September 30, 2021

Ute Water - 2190 H ¼ Road